Official information about the 2007-2031 RTP is provided by the Lane Council of Governments, which is the official Central Land Metropolitan Planning Organizatioon (MPO) responsible for meeting federal metropolitan transportation planning requirements.

Contents

RTP Update Status

  • Today (Sunday), the final draft 2007-2031 RTP is finally available online. —Rob, 9 September 2007
  • "The MPC packet went out yesterday, and parts of it are up on the LCOG website now. In particular, read the cover letter for the RTP agenda item and draw your own conclusions. As for the final draft RTP itself, I just spoke to Paul Thompson, who said that it isn't yet online but will be online by 5 pm today (Friday)." —Rob, 7 September 2007
  • "Looking at the LCOG website, I see that there isn’t any new info available about the RTP update since the materials for the August 9 MPC meeting were published. In particular, only a preliminary (and hence incomplete) draft of the RTP is available, making it hard to prepare for the public hearing on September 13." —Rob, 5 September 2007
  • "The update for the 2031 RTP is currently underway. Draft materials are being produced for review by MPC at the policy board's regular meetings. The public comment period will be open from August 3, 2007 through 5 pm October 8, 2007. A public hearing is scheduled for 11:30 am on September 13, 2007, at the MPO policy board meeting to be held at the Springfield Library Meeting Room." —official RTP web page
  • There have been changes to 2 opportunities for the public to comment on the update of the Regional Transportation Plan: 1) The public comment period has been extended to October 8, 2007; and 2) The public hearing has been changed to September 13, 2007. —email message from the Central Lane MPO, 3 August 2007

RTP Overview

The Regional Transportation Plan guides planning and development of the transportation system within the Central Lane Transportation Management Area (TMA). The federally-required RTP includes provisions for meeting the transportation demand of residents over at least a 20-year planning horizon while addressing transportation issues and making changes that can contribute to improvements in the region’s quality of life and economic vitality. It includes consideration of all transportation modes: roadways, transit, bikeways and pedestrian circulation, as well as freight movement and regional aspects of air, rail and inter-city bus service.

The regional planning process thus ensures that the planning activities and investments of the local jurisdictions are coordinated in terms of intent, timing, and effect. Projects in the RTP are initiated at the local and state level (i.e., within the planning processes of the cities of Eugene, Springfield, and Coburg; Lane Transit District, Lane County and the Oregon Department of Transportation – ODOT). Those projects that anticipate Federal funding or are regionally significant with potential impact on air quality must be included in the RTP.

In compliance with the Federal Transportation Equity Act for the 21st Century (TEA-21), and with the Oregon Transportation Planning Rule (TPR), the RTP contains transportation policies and expected actions, and is financially constrained to revenues reasonably expected to be available over the planning period. The RTP also includes demonstration of compliance with federal and state air quality requirements.

The RTP must be updated at least every four years, and must include participation by the citizens of the region.

On December 9, 2004, the 2004-2025 RTP was adopted by the Metropolitan Planning Committee, and has been approved by US Department of Transportation. Previously, TransPlan served as both the federally-required Regional Transportation Plan and the state-required local Transportation System Plan (TSP) for Eugene/Springfield. Now, with the expansion of the Metropolitan Planning Organization (MPO) boundary to include Coburg (due to population growth determined in the 2000 Census), the RTP serves as the federally required plan for the new MPO area, while TransPlan will continue to serve as the state-required plan for the Eugene/Springfield area.

RTP Contents

The final draft 2007-2031 RTP contains the following sections (compared to the current 2004-2025 RTP and the preliminary draft 2007-2031 RTP):

Introduction

This is Chapter 1 in the final draft 2007-2031 RTP.

...

Policy Element

This is Chapter 2 in the final draft 2007-2031 RTP.

...

Goals

This is Part One in the final draft 2007-2031 RTP.

...

Objectives

This is Part Two in the final draft 2007-2031 RTP.

...

Policies

This is Part Three in the final draft 2007-2031 RTP.

...

Plan Implementation

This is Chapter 3 in the final draft 2007-2031 RTP.

...

Capital Investment Actions

This is Part One in the final draft 2007-2031 RTP.

...

Financial Plan

This is Part Two in the final draft 2007-2031 RTP.

...

Regional Transportation Plan Amendment Process

This is Part Three in the final draft 2007-2031 RTP.

...

Air Quality Conformity

This is Part Four in the final draft 2007-2031 RTP.

...

Planning and Program Actions

This is Part Five in the final draft 2007-2031 RTP.

...

Parking Management Plan

This is Part Six in the final draft 2007-2031 RTP.

...

Intelligent Transportation System Operations and Implementation Plan

This is Part Seven in the final draft 2007-2031 RTP.

...

Plan Performance and Implementation Monitoring

This is Chapter 4 in the final draft 2007-2031 RTP.

...

Context for Assessment of Plan Performance

This is Part One in the final draft 2007-2031 RTP.

...

Projected Plan Performance

This is Part Two in the final draft 2007-2031 RTP.

...

TPR Alternative Performances Measures

This has been eliminated in the final draft 2007-2031 RTP, and is Part Three in the 2004-2025 RTP and the preliminary draft 2007-2031 RTP.

...

Congestion Management System

This is Part Three in the final draft 2007-2031 RTP, and is Part Four in the 2004-2025 RTP and the preliminary draft 2007-2031 RTP.

...

Plan Implementation Monitoring

This is Part Four in the final draft 2007-2031 RTP, and is Part Five in the 2004-2025 RTP and the preliminary draft 2007-2031 RTP.

...

Maps

This is Appendix A in the final draft 2007-2031 RTP.

Proposed Nodal Development Areas

This is Map 1 in the final draft 2007-2031 RTP.

Note for particular community interest and potential neighborhood impacts (positive, negative or both).

Financially Constrained Roadway Projects

This is Map 2 in the final draft 2007-2031 RTP.

...

Illustrative Roadway Projects

This is Map 3 in the final draft 2007-2031 RTP.

...

Federally Designated Roadway Functional Classifications

This is Map 4 in the final draft 2007-2031 RTP.

...

Bus Rapid Transit System

This is Map 5 in the final draft 2007-2031 RTP.

...

Existing LTD System

This is Map 6 in the final draft 2007-2031 RTP.

...

Financially Constrained Bikeway System Projects

This is Map 7 in the final draft 2007-2031 RTP.

...

Priority Bikeway System Projects

This is Map 8 in the final draft 2007-2031 RTP.

...

Illustrative Bikeway System Projects

This is Map 9 in the final draft 2007-2031 RTP.

...

Goods Movement and Intermodal Facilities

This is Map 10 in the final draft 2007-2031 RTP.

...

Commuter Solutions Regional Programs

This is Map 11 in the final draft 2007-2031 RTP.

...

Congestion Management System

This is Map 12 (not yet available) in the final draft 2007-2031 RTP.

...

Levels of Service Standards

This is Appendix B in the final draft 2007-2031 RTP.

...

List of Supporting Documents

This is Appendix C in the final draft 2007-2031 RTP.

...

Glossary and Acronyms

This is Appendix D in the final draft 2007-2031 RTP.

...

LCDC Order Approving Alternative Plan Performance Measures

This has been eliminated in the final draft 2007-2031 RTP, and is Appendix E in 2004-2025 RTP and the preliminary draft 2007-2031 RTP.

...

Development of TPR Alternative Measures

This has been eliminated in the final draft 2007-2031 RTP, and is Appendix F in 2004-2025 RTP and the preliminary draft 2007-2031 RTP.

...

Executive Summary of the Regional ITS Operation & Implementation Plan for the Eugene-Springfield Metropolitan Area

This is Appendix E in the final draft 2007-2031 RTP, and is Appendix G in the 2004-2025 RTP and the preliminary draft 2007-2031 RTP.

...

Maps Developed for Environmental Coordination Requirements of SAFETEA-LU §6001

This is the new Appendix F in the final draft 2007-2031 RTP (without maps or with maps), and is the new Appendix H in the preliminary draft 2007-2031 RTP.

...

Personal tools